Why Service & Calibration Matters
Protect Your Investment. Protect Your People.
Tooling is an extension of oneself and has always been one of the most crucial assets for artisans and technicians. These tools make your job possible, safe and efficient. In return, you as the user have a responsibility to protect and maintain your equipment. Maintenance and care will ensure your tooling serves you for a longer time with optimum results.
Controlled bolt fastening equipment (torque and tension equipment) not only requires regular service and maintenance to perform at its very best, but it requires frequent calibration and verification to ensure compliance with OEM design specifications.
The industry-accepted guideline schedule for both service maintenance and calibration is 12 months from initial use. Due to the varied applications, environments and usage rates, contact the Titeforce Service Team for a tailored service and calibration schedule that best suits your torque or tension tool crib.


What We Do
Three Pillars of Tool Care
01
Service & Repairs
Complete strip-down, clean and assessment of your torque or tension tools. All wearable and high-risk parts replaced with genuine OEM spares. Your equipment is reassembled to OEM-specified tolerances and tested before dispatch.
02
Calibration & Certification
Full calibration and verification against OEM specifications with traceable certification. 5-point output verification testing and simulation joint testing ensure your tools deliver accurate, repeatable results every time.
03
OEM Spare Parts
All standard OEM service kits kept on hand for fast turnaround. We stock genuine parts for RAD Torque Systems, TorsionX, Durapac, Norwolf and all supported brands. No aftermarket substitutes, no compromises.
The Process
12-Step Servicing & Calibration Checklist
Every tool that enters our service centre goes through a rigorous 12-step process before it leaves with the Titeforce Stamp of Quality.
01
External Unit & Accessory Inspection
Visual and physical assessment of the unit exterior, hoses, fittings and all accessories for damage or wear.
02
Zero Load Operational Testing #1
Baseline operational test under zero load to identify faults, leaks and abnormal behaviour before strip-down.
03
5-Point Output Verification Test
Output measured at five incremental points across the tool’s range to assess deviation from specification.
04
Complete Unit Strip, Clean & Assessment
Full disassembly, ultrasonic cleaning, and detailed inspection of all internal components against OEM spec sheets.
05
OEM Parts Replacement
All wearable and high-risk parts replaced with genuine OEM spares. Seals, bearings, springs and wear components.
06
Reassembly to OEM Tolerances
Precision reassembly following OEM-specified torque values, clearances and assembly sequences.
07
Zero Load Operational Testing #2
Post-rebuild operational test confirming smooth, fault-free operation before calibration begins.
08
Complete Calibration & Certification
Full calibration against traceable reference equipment with formal certification documentation issued.
09
Simulation Joint Testing
Real-world load testing on a simulation joint to verify performance under actual working conditions.
10
Respray & Identification Branding
Professional respray and replacement of all identification labels and branding. Your tool returns looking factory-new.
11
Quality Approval & Dispatch
Final quality gate review and approval before the unit is cleared for dispatch back to site.
12
Titeforce Stamp of Quality
Your tool carries the Titeforce Stamp of Quality. Certified, calibrated and ready for duty.




Get In Touch
Book a Service or Calibration
Ready to get your torque or tension equipment serviced? Complete the enquiry form and our service team will be in touch to arrange collection, assess your tooling and provide a detailed quote.
Service Enquiry
Complete the form below and we will be in touch within 24 hours.
